DEALER LOGIN
Trend
Login  |  Register
Items 0  |   View order

Construction Of Raised Panel Doors

Construction Of Raised Panel Doors
  1. Traditionally, panelled doors involved complex mortise and tenon joints. The router mounted in the table and used in conjunction with a profile and scriber set, now produce an equivalent joint with greater ease. There are several profiles available with raised panel cutters to match.
Construction Of Raised Panel Doors
  2. As the name implies the ‘profile and scriber’ cutter performs both operations by re-arranging the block, groover and bearing. Raised panels can be made from solid wood or MDF and shaped by panel cutters again mounted in a table.
Construction Of Raised Panel Doors
  3. The scribing of the rail is cut first with the face side uppermost. The bearing regulates the depth. With all the scribes cut, re-arrange the cutter to profile all the components face side to the table.
Construction Of Raised Panel Doors
  4. When machined, the panel locates into the groove. Several passes with the panel cutter will be required to obtain the correct depth. Dry assemble all components to ensure a tight fit. Glue joints and cramp up. The panel is left unglued to allow movement over time.
     
< Back to Index Previous   Previous   |  Next   Next
https://uk.trustpilot.com/review/trend-uk.com [^]
 
  Aspin Interactive e-commerce